QBM051
Q1. A cistern is normally filled in 6 h but takes 4 h longer to fill because of a leak in its bottom. If the cistern is full, the leak will empty it in how much time?
Q2. Two pipes A and B can fill a tank in 8 hours. If only pipe A is open, then it would take 4 hours longer to fill. Find how much longer would it take if only pipe B is open?
Q3. Bob and Mose set off at the same time on a 30 km walk for charity. Bob walks 1.4 km/h faster than Moe, but stops for 20 min on route. Even with the delay, Bob finishes 2 hours ahead of Moe. How fast was each [erson walking, and how long did it take for each person to finish the walk?
Q4. If A and B work together, they will complete a job in 7.5 days. However, if A works alone and completes half the job and then B takes over and completes the remaining half alone, they will be able to complete the job in 20 days. How long will B alone take to do the job if A is more efficient than B?
(1)20 days
(2)40 days
(3)30 days
(4)24 days
Q5.A water tank has three outlet taps A, B and C. A fills 4 buckets in 24 min, B fills 8 buckets in 1 hr and C fills 2 buckets in 20 minutes. If all the tapes are opened together, a full tank is emptied in 2 hr. If a bucket contains 5 L of water, what is the capacity of tank?
Q6. Ten pipes through which water flows at the same rate can fill a tank in 24 minutes. If two pipes go out of order, how long will the remaining pipes take to fill the tank?
(a) 40 minutes
(b) 45 minutes
(c) 19-1/5 minutes
(d) 30 minutes
Q7. A certain number of men can do work in 60 days. If there were 8 men more it could be finished in 10 days less. How many men are there?
Q8.The Buna dam has four inlets. Through the first three inlets, the dam can be filled in 12 minutes; through the second, the third and fourth inlet, it can be filled in 15 minutes; and through the first and the fourth inlet, 20 minutes. How much time will it take all the four inlets to fill up the dam?
Q9. A can do a piece of work in 6 days, B in 8 days and C in 12 days , B & C together do the work for 2 days and then C is replaced by A. Find the total time required to finish the work?
Q10. 15 men take 21 days of 8 hours each to do a piece of work. How many days of 6 hours each would 21 women take, if 3 women do as much work as 2 men?
(a) 20
(b) 25
(c) 18
(d) 30
Q11. There are 12 pipes attached to a tank. Some of them are fill pipes and some are drain pipes. Each of the fill pipes can fill the tank in 12 hours, while each of the drain pipes will take 24 hours to drain a full tank completely. If all the pipes are kept open when the tank was empty, it takes 2 hours for the tank to overflow. How many of these pipes are drain pipes?
(1)6
(2)11
(3)4
(4)7
Q12. Two guys were working on your car. One can complete the given job in six hours, but the new guy takes eight hours. They worked together for two hours, but then the first guy left to help another mechanic on a different job. How long will it take the new guy to finish your car? ANS: It takes the new guy another 3 hours and twenty minutes to finish fixing your car.
Q13. A works twice as fast as B. if B can complete a piece of work independently in 12 days, S and B together can complete the work in:
a)4 days
b)6 days
c)8 days
d)18 days
END
few answers
Q2. ANS: 16 hours
Q4. Correct Answer - (3)
Q7. ANS: 40
Q11. Correct Answer - (3)
can u please help me to
This comment has been moved here.
Q1. A cistern is normally
Q1. A cistern is normally filled in 6 h but takes 4 h longer to fill because of a leak in its bottom. If the cistern is full, the leak will empty it in how much time?
Sol: Time taken to fill the cistern=6 hours.
Cistern filled in 1 hour=(1/6) th of the total capacity.
Let the time taken by the leak to empty the cistern when it is full be "a" hours.
Due to leak it will take 4 hours more i.e, total of 10 hours.
According to question,10(1/6-1/a)=1
Solving, a=15 hours.
Ans: 15 hours.
Q13. A works twice as fast
Q13. A works twice as fast as B. if B can complete a piece of work independently in 12 days, S and B together can complete the work in:
a)4 days
b)6 days
c)8 days
d)18 days
Sol: Let A complete a work in "a" days.
Then B will complete that work in "2a" days.
If B can complete a work in 12 days ,A will complete it in 6 days.
Let A & B can together complete that work in "b" days.
So,b(1/12+1/6)=1
Solving,b=4 days.
Ans: 4 days.
Q6. Ten pipes through which
Q6. Ten pipes through which water flows at the same rate can fill a tank in 24 minutes. If two pipes go out of order, how long will the remaining pipes take to fill the tank?
(a) 40 minutes
(b) 45 minutes
(c) 19-1/5 minutes
(d) 30 minutes
Sol:10 pipes can fill the tank in 24 minutes.
So,1 pipe can fill the tank in 24x10=240 minutes.
So,8 pipes can fill it in,24x10/8=30 minutes.
Ans: (d) 30 minutes.
Q9. A can do a piece of work
Q9. A can do a piece of work in 6 days, B in 8 days and C in 12 days , B & C together do the work for 2 days and then C is replaced by A. Find the total time required to finish the work?
Sol:Let A and C work together for "a" days.
So,2(1/8+1/12)+a(1/6+1/8)=1.
a=2 days.
So,total days (2+2)=4 days.
Ans:4 days.
Q10. 15 men take 21 days of
Q10. 15 men take 21 days of 8 hours each to do a piece of work. How many days of 6 hours each would 21 women take, if 3 women do as much work as 2 men?
(a) 20
(b) 25
(c) 18
(d) 30
Sol: Work of 3 women=Work of 2 men.
So,work of 21 women can be done by 14 men only.
15x21x8=6x14xa
a=30 days.
Ans: (d) 30 days.
Q8.The Buna dam has four
Q8.The Buna dam has four inlets. Through the first three inlets, the dam can be filled in 12 minutes; through the second, the third and fourth inlet, it can be filled in 15 minutes; and through the first and the fourth inlet, 20 minutes. How much time will it take all the four inlets to fill up the dam?
Sol: Let the alone time of the four pipes be a,b,c,d minutesreapectively.
According to question,
12(1/a+1/b+1/c)=1
(1/a+1/b+1/c)=1/12 ...(i)
15(1/b+1/c+1/d)=1
(1/b+1/c+1/d)=1/15 ...(ii)
20(1/a+1/d)=1
(1/a+1/d)=1/20 ...(iii)
Equn (i)-(ii) gives,
(1/a-1/d)=1/60...(iv)
Now eqn (iii)-(iv) gives;
a=30,d=60.
Let the time taken to full the tank when all the four pipes work together be"e" minutes.
So,e(1/a+1/b+1/c+1/d)=1
or,e(1/30+1/60+1/20)=1
Solving will give the value of e=10 .
Ans: 10 minutes.
Q12. Two guys were working
Q12. Two guys were working on your car. One can complete the given job in six hours, but the new guy takes eight hours. They worked together for two hours, but then the first guy left to help another mechanic on a different job. How long will it take the new guy to finish your car?
Sol: Let the time taken by the second guy to complete the work when the 1st gut has left be "a" hours.
According to question,
2(1/6+1/8)+a/8=1
Solving,a=10/3 hours.
=3 hours 20 minutes.
Q5.A water tank has three
Q5.A water tank has three outlet taps A, B and C. A fills 4 buckets in 24 min, B fills 8 buckets in 1 hr and C fills 2 buckets in 20 minutes. If all the tapes are opened together, a full tank is emptied in 2 hr. If a bucket contains 5 L of water, what is the capacity of tank?
Sol:A can fill 4 buckets in 24 minutes.Time taken to fill 1 bucket be A=6 minutes.
B can fill 8 buckets in 60 minutes.Time taken to fill 1 bucket =60/8 minutes.
C can fill 2 buckets in 20 minutes.Time taken to fill 1 bucket=10 minutes.
Let the time taken to fill 1 bucket when all the three taps works together=a minutes.
a(1/6+8/60+1/10)=1
a=60/24 minutes.
This implies that if all the three taps are working they will take 60/24 minutes to fill 1 bucket.So,in 120 minutes they can together fill,120x60/24 buckets.
And 1 bucket has the capacity of 5 L.
So,the tank capacity=120x5x60/24=1500 L.
Ans:1500 L
this is right method... good
this is right method... good and thanks for it....